Post
They reverted to a backup and it worked, but whenever they tried to update the maths -- which were also full of weird, redundant calculations -- it stopped working again. Nobody could figure it out. It made literally zero sense. They'd change a long formula to a shorter one and everything went nuts.
Probably a quirk of the specific compiler. This was in the late 1980s, but the code was old and ran on an IBM 300 series mainframe, which was already ancient. I recall the problem I had to fix, but not the details of the compiler version and manufacturer.
0 reposts2 likes
No replies yet.