Post

Waterfront news: Seawall Phase 2 (from Virginia to Broad, Phase 1 was S WA to Virginia) RFQ to release by EOY to advance design/permitting/etc beyond the current 35%.

It's funded with 1.15m for design but not the likely half-billion+ dollars that will be needed for construction (at ~3200' it's only slightly shorter than the ~3700' phase 1, which was $210M 2017- dollars).

0 reposts0 likes

No replies yet.