Value points are story points wearing a suit. Same Fibonacci guess, moved from the dev desk to the PO's chair. In banking that number existed so prioritization looked like math, not politics. Effort estimates got scrutiny. The value estimate, the one that decides what gets built, got a wave-through.
Post
The same issue shows up in training. People measure what looks clean, not what drives outcomes.
0 reposts0 likes