The first PVT exposed two probs 1) possible ESD damage during assembly was blowing out the BLE amp on some units, 2) a change we made to the mic membrane caused some units to fail audio testing. We fixed both with modifications to the assembly line. Things seem to be on a good track now with PVT2!

When will my Index 01 ship? Our goal is to manufacture the first 2k units by mid-May and start shipping them out. It will take us roughly 3 months to manufacture and ship out all pre-orders, meaning we should be finished by July. As always, these are estimates. Delays may happen!