Post
4/ That tiny 0.26% would cost Maine BIG. If this plan were in effect today, Maine would be hit with the maximum 15% cost share. That’s ~$100 million a year we’d have to come up with (or cut).
2 reposts5 likes
4/ That tiny 0.26% would cost Maine BIG. If this plan were in effect today, Maine would be hit with the maximum 15% cost share. That’s ~$100 million a year we’d have to come up with (or cut).
2 reposts5 likes