Post

A full kitchen install usually takes pros one to three days. Here it is in 2 minutes 45 seconds, with the one step that decides everything: leveling the base cabinets.

80 reposts531 likes

Only to realize I needed a Torx, which I didn’t have. Had to go to the hardware store, didn’t know what size so I bought a bunch of them.