Pinned
Edward Tissiman
Edward Tissiman
@edtiss.bsky.social
From Forres. Live in Edinburgh. Finished the Munros in 2021. Care about cycling and other stuff. https://medium.com/@edward.tissiman
702 followers112 following270 posts
No jail sentence. No driving ban. Free to continue driving around Edinburgh after assaulting a cyclist, leaving them with a traumatic brain injury, a smashed skull and a bleed on the brain. news.stv.tv/east-central...
Sources: Cycle lane data umove.usmart.ai/organisation... STATS19 collision data maps.dft.gov.uk/road-casualt... Council injury data www.edinburgh.gov.uk/homepage/104... - no. 64373 Bus passengers is a rough estimate based on timetables - Lothian Buses refused my FOI for stop-level data.
Edward Tissiman reposted
Edward Tissiman reposted
Edward Tissiman reposted
Replying to @walk-cycle-rant.bsky.social
I got through the waitlist for a hangar near me, so it does happen! New hangar locations here: consultation.appyway.com/edinburgh-ci...
Demand for spaces in cycle hangars in Edinburgh has increased by 2,700 (50%) in the last 12 months. After adjusting for duplication across waiting lists, I estimate that around 7,000 people currently want a spot in one - but Edinburgh Council only provide 1,500 spaces. rpubs.com/edtiss/hangars
Data available here, request 63936 (edinburgh.axlr8.uk/disclose/) @spokes.org.uk @livingstreetsedi.bsky.social @edinburghminute.com @edi.bike
Demand for spaces in cycle hangars in Edinburgh has increased by 2,700 (50%) in the last 12 months. After adjusting for duplication across waiting lists, I estimate that around 7,000 people currently want a spot in one - but Edinburgh Council only provide 1,500 spaces. rpubs.com/edtiss/hangars
The largest ward-level waiting list is Leith Walk, with around 1,100 people waiting on a spot. 190 additional hangars are required, with only 50 provided. As a ratio of current provision, there are 7 people for every spot in Inverleith. rpubs.com/edtiss/hanga...
Thanks to whoeever put this FOI in - edinburgh.axlr8.uk/documents/63... We need an insta-tow system, especially for foreign drivers and people negotiating these huge discounts.
Edward Tissiman reposted
Edward Tissiman reposted
Replying to @ellatasm.bsky.social
Thanks for sharing - this bridge has failed with <20% of its designed life span. So.. Who supplied & built it ? Is their warranty &/or are they still approved suppliers ? Why has routine inspection process failed ? Are there are other similar bridges to be checked ? Etc @spurtle.bsky.social
Just smashed through this record again with 3,036 cyclists on Friday, 14th August.
Yet another all-time record set on the Leith Walk cycle lane - 2,582 cyclists on 22nd July 2026. I suspect much of the surge this year is due to the brilliant success of Voi hire e-bikes. @edinburghminute.com @edi.bike @spokes.org.uk @edinreporter.bsky.social
Roseburn Path closed. Significant fire/ambulance/police presence at Coltbridge viaduct. @edinburghminute.com @edinreporter.bsky.social
Edward Tissiman reposted
Currently stuck in a traffic jam on North Bridge, caused by illegally parked cars and private drivers in the bus lane. @stephenjenkinson.bsky.social It was actually quicker with only two lanes. We’ve been overtaken by 9 Voi bikes so far.
Yet another all-time record set on the Leith Walk cycle lane - 2,582 cyclists on 22nd July 2026. I suspect much of the surge this year is due to the brilliant success of Voi hire e-bikes. @edinburghminute.com @edi.bike @spokes.org.uk @edinreporter.bsky.social
However, Edinburgh Council do not have access to Voi's origin-destination data (FOI 62471), and Voi have so far not agreed to make their data public. @stephenjenkinson.bsky.social, @cllrcmiller.bsky.social, @chasbooth.bsky.social, could you help in this regard?
Data from the city's previous hire bike scheme, Just Eat, is available - and it's brilliant for showing where latent demand for cycling exists, and where we should be investing in more cycle infrastucture. This is an extract from 20th June, 2020 (rpubs.com/edtiss/justeat) :
Edward Tissiman reposted
Why has north bridge been fully reopened to traffic with no changes to the road layout when this is in your City Mobility Plan? @stephenjenkinson.bsky.social @edinburghcouncil.bsky.social
Edward Tissiman reposted
#EdTravCyc @spokes.org.uk @edi.bike ⚠️ caution ⚠️ needed on North Bridge headed north. So many raised ironworks and no obvious warning signs (to me at least) could be lethal on a bike if not aware. Also amount of tarmac and road width being reinstated is crazy! No cycle provision or widened pavements
Edward Tissiman reposted
I'm a firm believer that if your "straightforward", "simple" street layout requires a 1 minute instructional video to try and explain what the ambiguous signs and all that paint on the road wants you to do, it's not nearly as straightforward and simple as you imagine it is.
Two stage right turns for cyclists have been introduced on Summerhall. This will make it safer and easier for cyclists to turn right onto Hope Park Terrace and from the opposite direction on Summerhall, right onto Melville Drive.
Edward Tissiman reposted
If I read this right, "we've shut the bus stops for eight years and noticed nobody has been using them in this period. There's clearly no observed demand so it is a clever, big-brain decision on our part not to reinstate them". Or am I missing something?
Well done CEC, another own goal. Not only have you failed to deliver any active travel improvements (contradicting your own circulation plan), somehow you manage to make things worse for bus passengers www.edinburghnews.scotsman.com/news/no-plan...
Edward Tissiman reposted
#PrincesStreet fire 👍 #Voi bikes to the rescue! 👍 Most flexible form of transport in an emergency --> www.edinburgh.gov.uk/news/article... @edi.bike @chdot.bsky.social @edfoc.bsky.social @stephenjenkinson.bsky.social @alastairdalton.bsky.social @moh-kohn.eurosky.social @keithirving.bsky.social
Edward Tissiman reposted
#Powderhall railway path - when? New website by @threadinburgh.scot & @chdot.bsky.social --> powderhall.link?ref=edinburg... HT @edinburghminute.com @edi.bike @edfoc.bsky.social @leithfeederride.bsky.social @jackrmcaldwell.bsky.social @edtiss.bsky.social @harryjwilliams.bsky.social
Edward Tissiman reposted
Has anyone else noticed this perma-puddle on Trinity Path? Edinburgh. As far as i remember, there has always been a wee burn to the edge of the path, with a puddle after rain. But these days the water feature is always there -even in drought times. @spokes.org.uk ?
Edward Tissiman reposted
Rails to Trails: the thread about how North Edinburgh got its cycle paths On this day, 40 years ago, a councillor cut the ceremonial ribbon and opened a section of cycle path in north Edinburgh. This was a rather special bit of cycle path however as it hadn't been built by the council. It was…
Yet another cyclist injury at the junction Dalmeny Street/Easter Road. As cycling around Leith Walk has exploded in popularity, so will injuries unless adjacent streets are made safe. I make it 11 injuries 2020-2024, and a number of collisions since then. www.edinburghlive.co.uk/news/edinbur...
I know @jackrmcaldwell.bsky.social has been doing a good job raising awareness of this - each new injury is a direct result of the council’s delay.
Edward Tissiman reposted
#SpokesCount 🚲 up everywhere! 🚲 31% of citybound #ForrestRoad 🚘 single-occupancy 👇 -> www.spokes.org.uk/2026/05/spok... ?Reasons 🤔 #VoiBikes 🤔 #CostOfLiving @edi.bike @edinreporter.bsky.social @edinburghminute.com @chdot.bsky.social @edfoc.bsky.social @edtiss.bsky.social @thecockburn.bsky.social
With thousands of cyclists now using Leith Walk every day, it does suggest that the recent and dramatic fall in *pedestrian* casualties might be related to the introduction of this active travel infrastructure. bsky.app/profile/edti...
There is a lot of chat about the danger posed by the introduction of cycle lanes and floating bus stops on Leith Walk from 2021 onward. Pedestrian casualties, Leith Walk, by year: 2015: 15 2016: 13 2017: 9 2018: 10 2019: 12 (including two fatalities) 2020: 3 2021: 0 2022: 2 2023: 0 2024: 2